Traveling Full Hybrid DAQload | |||||||||||
Line: 6 to 6 | |||||||||||
This test was run using the older hardware (meaning LVDS Buffer instead of SLVS Buffer Board). The software version was 4775, the firmware was va0fa. | |||||||||||
Added: | |||||||||||
> > | The tests were run on March 14th, 2017. Specifically the macro Start_and_Run_ABC130.cpp was run. This tests stability by performing 100 3PG scans. The results are summarized below (this is what was uploaded to the ATLAS TWiki https://twiki.cern.ch/twiki/bin/view/Atlas/TravelingDaqLoad![]()
| ||||||||||
-- ![]() Comments | |||||||||||
Deleted: | |||||||||||
< < | |||||||||||
\ No newline at end of file | |||||||||||
Added: | |||||||||||
> > |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
Traveling Full Hybrid DAQloadThe DAQload arrived from Santa Cruz on March 13th 2017. Dry air was connected to the box and tests were run. This test was run using the older hardware (meaning LVDS Buffer instead of SLVS Buffer Board). The software version was 4775, the firmware was va0fa. --![]() Comments |